by Ane Sestafe | May 29, 2026
The Challenge This project presented unique logistical complexities. Bald Head Island, now a resort community, has restricted vehicle access and limited capacity to support heavy construction activities. As a result, all personnel, tools, equipment, and...
by Janire Monsalvo | Feb 5, 2026
The Challenge The SNIACE project represented a significant technical and operational challenge, as it required the management of large volumes of sludge within an industrial facility that remained fully operational. The works had to be carried out while ensuring...
by Janire Monsalvo | Dec 2, 2025
The Challenge DOMINION carried out the first hydrocarbon sludge recovery and valorization intervention in Chile, at the ENAP Concón refinery. The project involved cleaning two tanks using our DOMINION Tank Cleaning (DTC) system, a technology that enables safe and...
by Ane Sestafe | Mar 10, 2025
The Challenge The main challenge of the project was the complete degassing of a propylene sphere with a capacity of 5000 m3 at a pressure of 7 bars, preventing the emission of polluting gases into the atmosphere and ensuring the absence of explosiveness during...
by Ane Sestafe | Mar 10, 2025
The Challenge The main challenge of the project was the complete degassing and inerting of 6 floating roof tanks containing 95 and 98 gasoline located at the EPT of Cartagena Repsol Refinery.Therefore, the main goal was to prevent the emission of polluting...