The rebuilding of a float glass furnace for Saint Gobain
Poland
DOMINION completed the rebuilding of the F520 float glass furnace for Saint Gobain after a large fire in Dabrowa Gornicza, Poland.
The challenge
To rebuild the F520 float glass furnace for Saint-Gobain in Poland to set it back into operation in record time after a large fire caused by an accident when a refractory part was being replaced.
DOMINION's +
To rebuild the F520 float glass furnace for Saint-Gobain in Poland to set it back into operation in record time after a large fire caused by an accident when a refractory part was being replaced.
Results
The complete Float Glass Furnace was set into operation in under 6 months, in which time more than 10,500 tons of refractory was installed and the hot work sealing was performed.
This video is provided by YouTube. Please accept marketing cookies to view it.
Estamos para ayudarte en tu proyecto
Ponte en contacto con nosotros y empecemos a mejorar la eficiencia de tu compañía a través de la innovación.
